Below is a record of each mission completed by our team. For every launch, you’ll find the mission status, launch date, maximum altitude, maximum acceleration, flight duration, and maximum speed. The data for each flight is presented below.

Pleiades Program
Status: On Going
The Pleiades Program holds all launches that carry an H or I class motor for the use of getting high powered rocketry certified level 1 or if not being certified then are launching with an engineering or scientific goal.
Number of Rockets: 4
Success Rate: 100%
Goal: All team members level 1 certified, learn rocketry basics, preparation for level 2 certification

Pleiades 3
Status: Success
Launch Date: August 8, 2026
Notes: Small fire onboard, successful flight
| Altitude (ft) | 1,129 |
| Top Speed (mph) | 289 |
| Peak Acceleration (Gs) | 16.2 |
| Duration (s) | 62.8 |
| Motor Used | H219-14A |
| Rocket Used | Zephyr |
| Number of Rockets | 1 |

Pleiades 2
Status: Delayed
Launch Date: N/A
Notes: N/A
| Altitude (ft) | N/A |
| Top Speed (mph) | N/A |
| Peak Acceleration (Gs) | N/A |
| Duration (s) | N/A |
| Motor Used | N/A |
| Rocket Used | Zephyr |
| Number of Rockets | 1 |

Pleiades 1
Status: Success
Launch Date: June 13, 2026
Notes: All rockets succeed in their flights with all three earning level 1 high powered rocketry certification. One member will launch at a later date.
| Altitude (ft) | 1,305 |
| Top Speed (mph) | 274 |
| Peak Acceleration (Gs) | 17.8 |
| Duration (s) | 73.4 |
| Motor Used | H219-14A |
| Rocket Used | Zephyr |
| Number of Rockets | 3 |
